Meta Strikes Massive 6.6GW Deal: The Meta Nuclear Energy Deal 2035 Strategy
Meta has secured a massive 6.6GW nuclear energy deal with TerraPower and Oklo. This 2035 roadmap aims to power AI superclusters like Prometheus with stable, clean energy.
AI's thirst for power is officially insatiable. According to reports from The Verge, Meta has signed pivotal agreements with three major nuclear power providers to fuel its expanding AI data center footprint. The partners include Bill Gates-backed TerraPower, Sam Altman-backed Oklo, and energy giant Vistra. It's a clear signal that Big Tech is no longer just buying electricity; they're building the grid.
Scale of the Meta Nuclear Energy Deal 2035
The total capacity secured through these deals is a staggering 6.6 gigawatts (GW). To put that in perspective, that's enough energy to power the entire nation of Ireland. These projects are slated to come online by 2035, with Meta funding the construction of new nuclear reactors. This move ensures a stable, carbon-free energy supply for the next decade of AI development.
Powering the Prometheus Supercluster
A primary beneficiary of this power surge is Prometheus, Meta's first massive AI supercluster located in New Albany, Ohio. Expected to be operational within 2026, Prometheus represents the cutting edge of Meta's computing infrastructure. By securing nuclear power, Meta avoids the volatility of the traditional energy market while meeting its sustainability goals.
Authors
Related Articles
Meta has signed massive nuclear power deals with Vistra, Oklo, and TerraPower to fuel its AI data centers. Explore the Meta nuclear energy deals 2026 roadmap and SMR strategy.
Meta has signed deals with Vistra, TerraPower, and Oklo to secure 6.6GW of nuclear energy by 2035 for its Prometheus AI supercluster. Learn how Big Tech is pivoting to nuclear.
Waymo's new Ojai robotaxi isn't just a vehicle upgrade. It's the company's most serious attempt yet at cracking the cost problem that has kept autonomous vehicles from scaling. Here's what's really at stake.
Snowflake's new $6 billion AWS contract is about more than cloud spending. It signals a shift in AI infrastructure—away from Nvidia GPUs and toward cheaper, homegrown chips for the agent era.
Thoughts
Share your thoughts on this article
Sign in to join the conversation