Liabooks Home|PRISM News
Futuristic view of Meta AI data center integrated with a nuclear power plant
TechAI Analysis

Meta Strikes Massive 6.6GW Deal: The Meta Nuclear Energy Deal 2035 Strategy

2 min readSource

Meta has secured a massive 6.6GW nuclear energy deal with TerraPower and Oklo. This 2035 roadmap aims to power AI superclusters like Prometheus with stable, clean energy.

AI's thirst for power is officially insatiable. According to reports from The Verge, Meta has signed pivotal agreements with three major nuclear power providers to fuel its expanding AI data center footprint. The partners include Bill Gates-backed TerraPower, Sam Altman-backed Oklo, and energy giant Vistra. It's a clear signal that Big Tech is no longer just buying electricity; they're building the grid.

Scale of the Meta Nuclear Energy Deal 2035

The total capacity secured through these deals is a staggering 6.6 gigawatts (GW). To put that in perspective, that's enough energy to power the entire nation of Ireland. These projects are slated to come online by 2035, with Meta funding the construction of new nuclear reactors. This move ensures a stable, carbon-free energy supply for the next decade of AI development.

Powering the Prometheus Supercluster

A primary beneficiary of this power surge is Prometheus, Meta's first massive AI supercluster located in New Albany, Ohio. Expected to be operational within 2026, Prometheus represents the cutting edge of Meta's computing infrastructure. By securing nuclear power, Meta avoids the volatility of the traditional energy market while meeting its sustainability goals.

This content is AI-generated based on source articles. While we strive for accuracy, errors may occur. We recommend verifying with the original source.

Related Articles