Joby Aviation Ohio Manufacturing Facility Expansion: Scaling for 2027 Production Goals
Joby Aviation acquires a 700,000-square-foot manufacturing facility in Dayton, Ohio. The move aims to double production to 4 aircraft per month by 2027.
The race for the skies just hit high gear. Joby Aviation just more than doubled its manufacturing footprint with a massive 700,000-square-foot facility in Ohio, signaling a major move toward the mass production of electric air taxis.
Inside Joby Aviation Ohio Manufacturing Facility Growth
On Wednesday, January 7, 2026, the Santa Cruz-based air taxi pioneer announced its acquisition of a large-scale manufacturing plant in Dayton, Ohio. According to CNBC, this site—the company's third facility—will be instrumental in achieving Joby's goal to produce four aircraft a month by 2027. CEO JoeBen Bevirt highlighted that the "reindustrialization of Ohio" is now central to the company's story as it scales for both commercial and defense contracts.
| Metric | Details |
|---|---|
| Facility Size | 700,000 sq ft |
| Toyota Investment | $894 Million |
| 2027 Target | 4 aircraft/month |
The FAA Certification Race of 2026
The stakes couldn't be higher as we move through 2026. Joby and its primary rival, Archer Aviation, are sprinting toward final FAA certification. With government backing through pilot programs and rollout roadmaps, the U.S. is positioning itself as the global hub for electric vertical takeoff and landing (eVTOL) technology. Joby's massive investment in physical infrastructure suggests they're confident that commercial flights aren't just a dream, but an imminent reality.
This content is AI-generated based on source articles. While we strive for accuracy, errors may occur. We recommend verifying with the original source.
Related Articles
The 2026 flying taxi commercial launch is approaching as UAE and China lead the eVTOL race. Learn about Joby Aviation, EHang, and the future of urban air mobility.
Discover 7 innovative startups from TechCrunch Startup Battlefield 200 redefining space and defense. From propellantless propulsion to GPS-free AI navigation, the future of the frontier is here.
Nvidia and the South Korean Science Ministry have agreed to swiftly set up a new R&D center in 2026, focusing on AI startups and semiconductor R&D.
China successfully rescued a $50M stalled TBM under the Yangtze River with a 2mm vertical error. Learn how this engineering feat saved the Jiangyin-Jingjiang tunnel project.